Testing and commissioning
After installation but before connection, a cable circuit
will be tested to ensure that the system has been installed correctly and
that all joints are sound.
The transformers are being used to step up current from a
generator to the required system test voltage.
Transformer injecting high voltages into a cable during testing
Cable being linked to a high voltage source during testing in an urban area