Production and installation
High voltage underground power cables are produced
in modern state-of the art factories, using high purity raw materials and
clean manufacturing processes. The processes for producing installing
and testing cables are controlled by a series of rigorous international
standards.
Schematic of the standards which apply to cables:
After manufacture the cables are delivered to
site and installed in the system. The links below offer more information
on this process.
|