Underground cables cost more per kilometer than
overhead lines, but are a valuable solution where
overhead lines are unacceptable. Europacable
has published a position paper explaining its
views on where the higher costs of cable should
be accepted in power projects.
However, there is a considerable confusion about
exactly how much more cable costs. When thinking
about a power project, you must consider the
costs over the life cycle of the system installed
as well as the up front costs:
- The up front cost is paid in the first instance
- The life cycle cost includes not only the up
front cost, but also the costs of maintenance
and cost of power losses in the system over time
Efficient systems of any kind usually cost more
up front, but save money in the long term. This
module seeks to explain this situation for cable
projects.